大鸡巴日大鸡巴,日韩av电影在线不卡观看,5060午夜鲁鲁鲁鲁鲁,337P人体粉嫩胞高清

NEWS

Great news
Click Online Message

TEL:0391-5299981

EMAIL:qyyangnan@vip.163.com

ADDRESS:South Section of Taihang Avenue, QinYang

Industry news
Great news
Home > Juli News > Industry news

Problems in the coiling machine industry

Release time:2013-12-03 09:40:01 Source of the article:qyjljc Number of clicks:2770

  Although the integration of the two-roller industry in China has achieved certain results, there are still many shortcomings. Specifically, there are four aspects:

  First, the production management concept is backward, and the application level of information technology in the manufacturing process is low. At present, the production methods and management concepts of enterprises in China's coiling machine industry are generally backward. The lack of motivation and conditions for enterprises to develop the informationization of manufacturing and manufacturing links has made the level of integration of manufacturing links become the bottleneck for the production of boilers and production products. .

  Second, the ability of comprehensive collaborative innovation is insufficient. According to the results of the two-integration assessment, the current informationization single application of the enterprise in the coiling machine industry is generally good, and the information integration application has a certain scale and level, but the level of integrated integration, coordination and innovation between information systems needs to be improved. . Among them, smaller enterprises are more difficult to achieve comprehensive integration and synergy and innovation due to constraints such as late start, insufficient basic investment, and unregulated management.

  Third, the lack of information systems to meet the needs of the industry. The information system is the basis of the two-in-one integration of enterprises. At present, there is a lack of information systems suitable for the coiling machine enterprises in the market, which makes the integration of the two technologies often less than half the effort, and it is difficult to achieve the expected goals.

  Fourth, the industry standards are lagging behind, and the degree of integration of the two technologies is insufficient. The informatization construction standards suitable for the coiling machine industry are of great significance to the regulation of industry enterprises and the in-depth implementation of the integration of the two. At present, there is no unified standard of informationization in China, and the coiling machine industry lacks the applicable two-in-one integration standard. This causes the coiling machine enterprises to adopt different modeling standards and business process specifications in individual system applications, so that each Data exchange, convergence and collaborative integration between systems are difficult.



  • PHONE
  • message
    MESSAGE
  • map
    MAP
  • ewm
    QR CODE
  • 锦州市| 余庆县| 邳州市| 巨鹿县| 芜湖市| 蒙城县| 津市市| 石屏县| 巴青县| 上思县| 永兴县| 化隆| 蓝山县| 固原市| 凯里市| 玉屏| 库车县| 杨浦区| 射阳县| 高阳县| 本溪市| 延庆县| 景宁| 大理市| 商城县| 巴马| 肇州县| 洪雅县| 马龙县| 松桃| 陆川县| 南昌县| 湛江市| 昌平区| 仁布县| 东至县| 都昌县| 宣恩县| 清苑县| 普陀区| 威海市|